X-ray of São José do Rio Preto
A quick read of the municipality across the five dimensions. Each block shows the source and the date.
Registered tourism offering
17
places
CircuitoBR · Ref. 09/2026
Net tourism jobs
+224
net 2026
Hirings: 3,872
Dismissals: 3,648
Novo CAGED, tourism activities · Ref. 07/2026
Total ISS revenue
R$ 422.8 mn
Exact amount: R$ 422,774,358.35
Cumulative: 01/2025 a 12/2025
SICONFI/National Treasury, RREO Annex 03 · Ref. 12/2025
Completeness of CBR Tourism Intelligence
29%
filled in
Indicators filled in: 4 of 14
Indicators in the method: 15
Not applicable: 1
Band: Partial portrait
CBR Tourism Intelligence · Ref. 09/2026
ⓘ
The municipality has 0 companies in mandatory-registration CADASTUR activities (art. 21 of Law 11,771/2008), per the Federal Revenue database, and 302 providers operating in CADASTUR in those activities. In total, 338 providers of all activities are operating in CADASTUR. Extraction of 07/2026.
Places
Artists/attractions
Cultural venues
Municipality boundary (IBGE)
Tourism employment: evolution (12 months)
Offering by type
Economic
2 of 5 indicators filled in
Hotel occupancy rate
Data not yet available
No occupancy records in the period.
Source: Lodging establishments
Arrivals: bus terminals
Data not yet available
No flow records in the period.
Source: Bus terminal
Arrivals: airports
Not applicable to this municipality
Municipality without an airport.
Source: ANAC
Arrivals: charter
53,609 passengers
ⓘ Counted per leg: in charter travel the same group appears in arrivals and departures (round trip), which is why both figures match. CIET panel criterion; the ANTT panel counts single destinations.
Source: ANTT · Ref. 09/2026
Formal tourism jobs (CAGED)
+224 net
Hirings3,872
Dismissals3,648
Hirings of men1,679 (43.4%)
Hirings of women2,193 (56.6%)
Net balance, men+57
Net balance, women+167
Cumulative net 08/2023 to 07/2026 (change, not stock)+135
Source: Novo CAGED, tourism activities · Ref. 07/2026
ISS revenue (tourism)
Data not yet available
No ISS entries in the year.
Source: Municipal Department of Finance
Environmental
2 of 4 indicators filled in
Energy consumption
Data not yet available
No energy records in the period.
Source: Energy utility
Water and sewage consumption
Data not yet available
No water/sewage records in the period.
Source: Sanitation utility
Quality of beaches, rivers and lakes
3 inland-water points
Córrego da Biluca (BILU 02900)WQI 56, Good
Córrego da Piedade (IADE 04500)WQI 39, Fair
Reservatório do Rio Preto (RPRE 02200)WQI 68, Good
BasisAnnual average of each point, 2023
Source: CETESB · Ref. 12/2023
Solid waste management
424.05 t/day
Landfill quality index (IQR)10.0/10
ClassificationAdequado
Source: CETESB · Ref. 12/2024
Sociocultural
0 of 2 indicators filled in
Accessibility
Data not yet available
The annual on-site accessibility survey is not yet structured for automatic consolidation.
Source: Department survey
Local satisfaction
Data not yet available
No satisfaction surveys registered.
Source: Perception survey (CIET)
Governance
0 of 3 indicators filled in
Management Plan
Data not yet available
No Management Plan on record (required only where there is a Conservation Unit).
Source: Department of the Environment
COMTUR
Data not yet available
No COMTUR activity recorded in the year.
Source: Municipal COMTUR
Tourism Master Plan (PDTur)
Data not yet available
No Tourism Master Plan registered.
Source: Department of Tourism
Want the full portrait, with historical series and continuous reports?
View dossier and sources →Historical series and monthly reports are in the municipality's management panel.
See how management works →