X-ray of Ribeirão Pires
A quick read of the municipality across the five dimensions. Each block shows the source and the date.
Registered tourism offering
17
places
CircuitoBR · Ref. 09/2026
Net tourism jobs
+27
net 2026
Hirings: 314
Dismissals: 287
Novo CAGED, tourism activities · Ref. 07/2026
Total ISS revenue
R$ 57.7 mn
Exact amount: R$ 57,652,097.84
Cumulative: 01/2025 a 12/2025
SICONFI/National Treasury, RREO Annex 03 · Ref. 12/2025
Completeness of CBR Tourism Intelligence
29%
filled in
Indicators filled in: 4 of 14
Indicators in the method: 15
Not applicable: 1
Band: Partial portrait
CBR Tourism Intelligence · Ref. 09/2026
ⓘ
The municipality has 0 companies in mandatory-registration CADASTUR activities (art. 21 of Law 11,771/2008), per the Federal Revenue database, and 31 providers operating in CADASTUR in those activities. In total, 36 providers of all activities are operating in CADASTUR. Extraction of 07/2026.
Places
Artists/attractions
Cultural venues
Municipality boundary (IBGE)
Tourism employment: evolution (12 months)
Offering by type
Economic
2 of 5 indicators filled in
Hotel occupancy rate
Data not yet available
No occupancy records in the period.
Source: Lodging establishments
Arrivals: bus terminals
Data not yet available
No flow records in the period.
Source: Bus terminal
Arrivals: airports
Not applicable to this municipality
Municipality without an airport.
Source: ANAC
Arrivals: charter
3,111 passengers
ⓘ Counted per leg: in charter travel the same group appears in arrivals and departures (round trip), which is why both figures match. CIET panel criterion; the ANTT panel counts single destinations.
Source: ANTT · Ref. 09/2026
Formal tourism jobs (CAGED)
+27 net
Hirings314
Dismissals287
Hirings of men129 (41.1%)
Hirings of women185 (58.9%)
Net balance, men+8
Net balance, women+19
Cumulative net 05/2024 to 07/2026 (change, not stock)+80
Source: Novo CAGED, tourism activities · Ref. 07/2026
ISS revenue (tourism)
Data not yet available
No ISS entries in the year.
Source: Municipal Department of Finance
Environmental
2 of 4 indicators filled in
Energy consumption
Data not yet available
No energy records in the period.
Source: Energy utility
Water and sewage consumption
Data not yet available
No water/sewage records in the period.
Source: Sanitation utility
Quality of beaches, rivers and lakes
3 inland-water points
Reservatório do Rio Grande (RGDE 02030)WQI 64, Good
Sed. Não 23 31 52 46 44 54 Ribeirão Pires (PIRE 02900)WQI 34, Poor
Sed. Não 23 44 30 46 24 59 (RGDE 02200)WQI 74, Good
BasisAnnual average of each point, 2023
Source: CETESB · Ref. 12/2023
Solid waste management
106.99 t/day
Landfill quality index (IQR)9.3/10
ClassificationAdequado
Source: CETESB · Ref. 12/2024
Sociocultural
0 of 2 indicators filled in
Accessibility
Data not yet available
The annual on-site accessibility survey is not yet structured for automatic consolidation.
Source: Department survey
Local satisfaction
Data not yet available
No satisfaction surveys registered.
Source: Perception survey (CIET)
Governance
0 of 3 indicators filled in
Management Plan
Data not yet available
No Management Plan on record (required only where there is a Conservation Unit).
Source: Department of the Environment
COMTUR
Data not yet available
No COMTUR activity recorded in the year.
Source: Municipal COMTUR
Tourism Master Plan (PDTur)
Data not yet available
No Tourism Master Plan registered.
Source: Department of Tourism
Want the full portrait, with historical series and continuous reports?
View dossier and sources →Historical series and monthly reports are in the municipality's management panel.
See how management works →