X-ray of Pirapora do Bom Jesus
A quick read of the municipality across the five dimensions. Each block shows the source and the date.
Registered tourism offering
28
places
CircuitoBR · Ref. 09/2026
Net tourism jobs
-7
net 2026
Hirings: 15
Dismissals: 22
Novo CAGED, tourism activities · Ref. 07/2026
Active companies
No data yet
Federal Revenue Service
Total ISS revenue
R$ 5.5 mn
Exact amount: R$ 5,454,185.63
Cumulative: 01/2025 a 12/2025
SICONFI/National Treasury, RREO Annex 03 · Ref. 12/2025
Completeness of CBR Tourism Intelligence
36%
filled in
Indicators filled in: 5 of 14
Indicators in the method: 15
Not applicable: 1
Band: Partial portrait
CBR Tourism Intelligence · Ref. 09/2026
ⓘ
The municipality has 0 companies in mandatory-registration CADASTUR activities (art. 21 of Law 11,771/2008), per the Federal Revenue database, and 3 providers operating in CADASTUR in those activities. In total, 6 providers of all activities are operating in CADASTUR. Extraction of 07/2026.
Places
Artists/attractions
Cultural venues
Municipality boundary (IBGE)
Tourism employment: evolution (12 months)
Offering by type
Economic
3 of 5 indicators filled in
Hotel occupancy rate
Data not yet available
No occupancy records in the period.
Source: Lodging establishments
Arrivals: bus terminals
Data not yet available
No flow records in the period.
Source: Bus terminal
Arrivals: airports
Not applicable to this municipality
Municipality without an airport.
Source: ANAC
Arrivals: charter
457 passengers
ⓘ Counted per leg: in charter travel the same group appears in arrivals and departures (round trip), which is why both figures match. CIET panel criterion; the ANTT panel counts single destinations.
Source: ANTT · Ref. 08/2026
Formal tourism jobs (CAGED)
-7 net
Hirings15
Dismissals22
Hirings of men3 (20.0%)
Hirings of women12 (80.0%)
Net balance, men+0
Net balance, women-7
Cumulative net 01/2025 to 07/2026 (change, not stock)+0
Source: Novo CAGED, tourism activities · Ref. 07/2026
ISS revenue (tourism)
🔒 Reported by the administration · publication not authorized
ⓘ Reported by the municipal administration. Publication depends on acceptance of the current version of the Management Panel Terms of Use, which contains the authorization clause.
Source: Municipal Department of Finance · Ref. 06/2026
Environmental
2 of 4 indicators filled in
Energy consumption
Data not yet available
No energy records in the period.
Source: Energy utility
Water and sewage consumption
Data not yet available
No water/sewage records in the period.
Source: Sanitation utility
Quality of beaches, rivers and lakes
3 inland-water points
Monit. Aut. EF-03. Próximo da ponte sobre o Rio Tietê, na estrada vicinal para a fazenda Santo Olegário, em Laranjal Paulista, entre SP 127 e SP 300. EF-03-Laranjal Paulista). Não 22 57 26 47 49 14 Reservatório de Rasgão (TIRG 02900)WQI 22, Poor
Nao informado no Apendice A (2024) (TIET 02250)WQI 24, Poor
Reservatório de Pirapora (TIPI 04900)WQI 23, Poor
BasisAnnual average of each point, 2023
Source: CETESB · Ref. 12/2023
Solid waste management
13.19 t/day
Landfill quality index (IQR)9.2/10
ClassificationAdequado
Source: CETESB · Ref. 12/2024
Sociocultural
0 of 2 indicators filled in
Accessibility
Data not yet available
The annual on-site accessibility survey is not yet structured for automatic consolidation.
Source: Department survey
Local satisfaction
Data not yet available
No satisfaction surveys registered.
Source: Perception survey (CIET)
Governance
0 of 3 indicators filled in
Management Plan
Data not yet available
No Management Plan on record (required only where there is a Conservation Unit).
Source: Department of the Environment
COMTUR
Data not yet available
No COMTUR activity recorded in the year.
Source: Municipal COMTUR
Tourism Master Plan (PDTur)
Data not yet available
No Tourism Master Plan registered.
Source: Department of Tourism
Want the full portrait, with historical series and continuous reports?
View dossier and sources →Historical series and monthly reports are in the municipality's management panel.
See how management works →